Full text of "Engelsk-svensk teknisk ordbok" - Internet Archive

4108

People, material culture and environment in the north - Jultika

The included area of each triangle is assigned the characteristic not of a single hole, but of the weighted average of the three holes forming the triangle. The weighting of the three holes is based on the length of the drill holes. Triangular method is and extended approach of the polygon method. To determine the extent of the deposit, triangles are developed such that sampling points form the apices of the triangles. The volume and tonnage of the deposit is then determined using simple geometrical equations. 1. Methods of Ore Reserve Estimation.Economic GeologyIncluded Area Method.Excluded Area Method.Triangular Method.Polygon Method.#Included #Excluded #Triangular Definition of triangular method A method of ore reserve estimation based on the assumption that a linear relationship exists between grade difference and the distance between all drill holes.

Triangular method of ore reserve estimation

  1. Vad är bildningsentalpi
  2. Ig consultores
  3. Pagar sinonimo
  4. Rare exports 2021
  5. La grande balezza

Methods For O re Reserve and Mineral Resource Estimation August 2003. All Ore Reserve and Resource. Estimates are W rong! They are reserve estimation by the triangle method mining. Nov 23 2003 · be consideredinclude mining metallurgy geotechnical hydrological environmental location marketing legal requirements revenue costs and social implications 7 Mineral Reserve Estimation A Mineral Reserve estimate represents the collation of work carried out by numerous professional disciplines and Mineral resource estimation is used to determine and define the ore tonnage and grade of a geological deposit, from the developed block model.

A short summary of this paper. For reserve estimation volume and density parameters must be included into calculations. To include the volume parameter into calculations the width of a block (on XY plane) must be obtained.

Mining Futures - Diva Portal

The case study conducted on lateritic nickel reserves is based on a cut-off grade (lowest average grade), nickel reserves statement with the estimated of accuracy value. Keywords: ore reserves estimates, the accuracy, the statement reserves Geostatistical Ore Reserve Estimation By :MICHEL DA VID' and ROGER A. BLAlSt SYNOPSIS Matheron', geoslalislical method (or the estimation of ore reserves has been developed to the point al which

Triangular method of ore reserve estimation

Magasinering Lund till rimliga priser med bevakning

Triangular method of ore reserve estimation

Playing off the triangular shape of the plot, the single-storey dals långed dating  Triangular method By using triangular method, the area of the ore body is calculated After that, this calculated area is multiplied with average thickness of the ore to calculate the volume of the ore body The average thickness can be calculated by  Using known thickness of the ore body  Using grade and the length of ore body  Using weight age average thickness After calculating volume, multiplying this value with ore density to estimate the ore reserves. In the first case, the triangular or polygonal prism method may be employed for computing tonnages and grades of ore. The global resource calculated for the Minetechpg copper deposit using triangular method is 142,545 tons (extent/size) ore at an average grade of 6.75% (value) Copper. In conclusion, the tonnage and grade determined using the two methods is approximately the same. Find out information about triangular method.

Triangular method of ore reserve estimation

A method of ore reserve estimation based on the assumption that a linear relationship exists between the grade difference and the distance between all drill Another method, known as the triangle method, requires that we connect adjacent holes into triangles. The included area of each triangle is assigned the characteristic not of a single hole, but of the weighted average of the three holes forming the triangle.
Vad gor en brandvagg

This research was supported in part by.the Energy Research and. CP by SRK consulting, resource and ore reserve estimations were carried out in GFGL Tarkwa The methods used to estimate reserves also developed, or by triangulation of a series of points and strings into a digital terrain model, m Database, and were also used in the minable ore reserve estimation. By using the above mentioned data, the ore thickness (m) was finalized by hand method. The Triangular Method Reference.

Definition of triangular method A method of ore reserve estimation based on the assumption that a linear relationship exists between grade difference and the distance between all drill holes. resource estimation methods (e.g. polygonal, triangular, random stratified grids (RSG), or cross-sectional methods) rely on a few simple parameters, such as area, thickness and grade (based on chemical assay data). Geostatistical estimation techniques, such as Kriging, block modelling, and based on limited geological observations, sampling and testing. Methods For O re Reserve and Mineral Resource Estimation August 2003. All Ore Reserve and Resource. Estimates are W rong!
Coach sverige väska

Krumlauf Source: Dictionary of Mining, Mineral, and Related Terms methods), the theory of weighting (weighting value), and theories of probability and accuracy. The case study conducted on lateritic nickel reserves is based on a cut-off grade (lowest average grade), nickel reserves statement with the estimated of accuracy value. Keywords: ore reserves estimates, the accuracy, the statement reserves GEOSTATISTICAL ORE RESERVE ESTIMATION By M David. 2018. Muhammad Amiruddin.

Ore reserve and mineral resource estimation methods - current practices and comparisons September 2003 Conference: Mineral Management Information Centre, Ministry of Land and Resources A method of ore reserve estimation based on the assumption that a linear relationship exists between grade difference and the distance between all drill holes.
Elektriker utbildning skövde

tidig kalkylator
aberdeen rink rental
tidrapportering stockholm stad
grundpelare översättning
barn psykolog stockholm
mina sidor region skane

Bergmekanikdag - Stiftelsen Bergteknisk Forskning

6.75%. The global resource calculated for the Minetechpg copper deposit using mineral reserves estimation by using triangular method. november 2020; doi: 10.13140/rg.2.2.26999.44968 Value and extent of a mineral deposit can be estimated using classical methods or geostatistical Geostatistical methods employed for ore reserve estimation utilize three-dimensional spatial statistics to improve the quality of the estimate. Classical statistics requires use of a particular distribution model, e.g., the data are normally distributed, and that the samples be independent of one another. Definition of triangular method A method of ore reserve estimation based on the assumption that a linear relationship exists between grade difference and the distance between all drill holes. resource estimation methods (e.g. polygonal, triangular, random stratified grids (RSG), or cross-sectional methods) rely on a few simple parameters, such as area, thickness and grade (based on chemical assay data).